Full material
₦ 5,000 $(29)
| Pages | 50 |
| Delivery | Instant, after payment |
Project Details
| Department | Building |
| Type | Project |
| Pages | 50 |
| Chapters | 5 |
| Format | MS Word & PDF |
| Reference No. | BLD0026 |
Abstract
CHAPTER ONE INTRODUCTION 1.1 Relevance of project 1.2 Site inspection 1.3 Evolution of road network in nigeria 1.4 Motor vehicle characteristic that affects road design data 1.5 Drivers and their characteristics 1.6 Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7 Factors Affecting Choice Of Station CHAPTER TWO THEODOLITE TRANSVERSING OF THE ROAD CONTROL 2.1 Definitions 2.2 Thetheodolite 2.3 Theodorite adjustment 2.3.1Temporary adjustment 2.3.2Permanent adjustment 2.4 Procedure for theodolite traversing 2.5Materials used for the theodolte traversinging CHAPTER THRE…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 50 |
| Delivery | Instant, after payment |
