Construction Of A Vertical Fire Tube Boiler

24 pages Chapters 6 ID: CNG0078

Full material

₦ 5,000 $(29)
Pages24
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp

Project Details

DepartmentChemical Engineering
TypeProject
Pages24
Chapters6
Methodologynil
Reference StyleYES
FormatMS Word & PDF
Reference No.CNG0078

Abstract

ABSTRACT            The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.The boiler contains 2 steam  tubes at triangular pitch which are enclosed in a shell.  Water is introduced through the shell.  When the burner is put on, the products of combustion – excess oxygen, nitrogen and carbondioxide pass through the tubes at a high temperature and then heats the surrounding water, as a resul…

This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material

Full material

₦ 5,000 $(29)
Pages24
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp
WhatsApp Us