Full material
₦ 5,000 $(29)
| Pages | 34 |
| Delivery | Instant, after payment |
Project Details
| Department | Chemical Engineering |
| Type | Project |
| Pages | 34 |
| Chapters | 5 |
| Methodology | nil |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | CNG0123 |
Abstract
ABSTRACTA temperature control apparatus an “Armfield model was refurbished. The methodology employed were to detect the pulty parts of the equipment especially in the sump where leakages were observed. In the repair, the water in the sump was drained off, corrosion and rusting in the tank were scraped off, the sump was washed and allowed to dry. A homogenous mixture of crown filler and hardener mixed in the ratio of 5.1 was used to coat the inner surface of the tank. Antirust protection was applied all over the inner surface of the tank in order to avoid further corrosi…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 34 |
| Delivery | Instant, after payment |
