Full material
₦ 5,000 $(29)
| Pages | 14 |
| Delivery | Instant, after payment |
Project Details
| Department | Chemical Engineering |
| Type | Project |
| Pages | 14 |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | CNG0394 |
Abstract
ABSTRACTThe design of a 1000 tonnes per annum Shea butter plant was carried out using data obtained from literature. Assumptions were made, where experimental data were not available. The block diagram, process flow sheet, material and energy balance on the process was carried out and presented on this work. A total of six units were used in the design, comprising of the dryer, de-sheller, roaster, expeller, filter and refiner (reactor). The plant is expected to operate for eight hours per day for 300 days with work free weekends and twelve public holidays. Two days overall maintenance is to b…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 14 |
| Delivery | Instant, after payment |
