Full material
₦ 5,000 $(29)
| Pages | 39 |
| Delivery | Instant, after payment |
Project Details
| Department | Civil Engineering |
| Type | Project |
| Pages | 39 |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | CVE0144 |
Abstract
ABSTRACT The construction industry consumes about forty percent of the world’s energy. The high increasing rate of construction activities has led to exploitation of most of the natural resources. These activities have led to massive deforestation and clearing of green cover for settlement and infrastructure development in Kampala. The repercussions of these activities are catastrophic such as poor air quality, urban heat island effect, toxic gas emission, increased cooling costs, which later affect people’s health. The study mainly aims at introducing and making aware to the public a technolo…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 39 |
| Delivery | Instant, after payment |
