Full material
₦ 5,000 $(29)
| Pages | 48 |
| Delivery | Instant, after payment |
Project Details
| Department | Construction Management |
| Type | Project |
| Pages | 48 |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | CMG0022 |
Abstract
ABSTRACT The work was an attempt to evolve a quicker and easier means of reaching high places and point safely in tall buildings and other high structures. This has no doubt saved consideration cost of employing cranes. A very clear account of the introduction and literature background of the project has been discussed in details. The report also unveils the preliminary experiments carried out to determine the load carrying capacity of the ladder. Efforts were also made to highlight various design alternative solutions and the selection criteria for the optimum design. Analysis of the va…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 48 |
| Delivery | Instant, after payment |
