Design And Construction Of A 3-phasea Automatic Power Change Over With Generator Set Switching Facility

65 pages Chapters 5 ID: ELE0075

Full material

₦ 5,000 $(29)
Pages65
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp

Project Details

DepartmentElectrical Engineering
TypeProject
Pages65
Chapters5
FormatMS Word & PDF
Reference No.ELE0075

Abstract

CHAPTER ONE INTRODUCTION The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with Generator switching which will eliminate the stress and lapses involved in the manual process. This electronics system is realized using 3 – phase regulated Dc power supply unit whose output is compared and fed to a 3 – input AND gate that encodes control lo…

This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material

Full material

₦ 5,000 $(29)
Pages65
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp
WhatsApp Us