Full material
₦ 5,000 $(29)
| Pages | 33 |
| Delivery | Instant, after payment |
Project Details
| Department | Mechanical Engineering |
| Type | Project |
| Pages | 33 |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | MCE0301 |
Abstract
An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months were measured for their wind and wave energy potentials. Also, the solar insolation for the location was collected for a 12month period. A pilot design based on techno-economic analysis was made for a wind-solar- gas turbine hybrid power system and results showed it's cheaper, environmentally friend, and more efficient and sustainable running a hybrid power system incorporating wind and solar energy systems to power th…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 33 |
| Delivery | Instant, after payment |
