Full material
₦ 5,000 $(29)
| Pages | 90 |
| Delivery | Instant, after payment |
Project Details
| Department | Public Administration |
| Type | Project |
| Pages | 90 |
| Chapters | 5 |
| Format | MS Word & PDF |
| Reference No. | PUB0373 |
Abstract
RESOLUTION OF INDUSTRIAL CRISIS BETWEEN MANAGEMENT AND EMPLOYEE IN PUBLIC SECTOR CONSTRAINTS AND PROSPECTS ABSTRACT This research work aimed at determining the most effective and efficient machinery in the resolution of industrial crisis between management and employees in the public sector in which federal polytechnic Oko Anambra State was used as a case study. The population of the study i.e as 1,900 which includes both academic and non-academic staff of the institution. The sample size of this study was 780. It was drawn by the use of simple random sample method. The data were collected th…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 90 |
| Delivery | Instant, after payment |
