Full material
₦ 5,000 $(29)
| Pages | 27 |
| Delivery | Instant, after payment |
Project Details
| Department | Quantity Surveying |
| Type | Project |
| Pages | 27 |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | QUS0086 |
Abstract
ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of buildings in Nakawa division, Kampala City. It specifically studied the cost control techniques currently being used by individual developers; the problems faced and proposed solutions. The research was able to identify seven commonly used cost control te…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 27 |
| Delivery | Instant, after payment |
