Full material
₦ 5,000 $(29)
| Pages | 67 |
| Delivery | Instant, after payment |
Project Details
| Department | Quantity Surveying |
| Type | Project |
| Pages | 67 |
| Chapters | 5 |
| Format | MS Word & PDF |
| Reference No. | QUS0019 |
Abstract
The source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study reviewed BESMM3 and surveyed possible block work items in construction sites. Ten work items were selected from the identified block work items in BESMM3 and construction sites for Physical observations and output measurement. A total of 105 sites were observed in …
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 67 |
| Delivery | Instant, after payment |
