Construction Of Steel Shelf

45 pages Chapters 5 ID: CNG0058

Full material

₦ 5,000 $(29)
Pages45
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp

Project Details

DepartmentChemical Engineering
TypeProject
Pages45
Chapters5
MethodologyDescriptive method
Reference StyleYES
FormatMS Word & PDF
Reference No.CNG0058

Abstract

ABSTRACTThe steel-shelf was constructed at the mechanical engineering workshop of the institute. It was done by first of all making out the dimension with the scribers, cutting, wielding, dittoing, assembling and painting. The method ology involved the preliminary calculation of the total surface area of the two mili meters thickness of the sheet measured 4ft with by 6ft height.Moreover, the first step taken in the fabrication of the said project was the selection of the material suitable for the construction.The material used in the construction were locally sourced and were selected to suit …

This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material

Full material

₦ 5,000 $(29)
Pages45
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp
WhatsApp Us