Construction Of Steel - Shelf

49 pages Chapters 4 ID: CNG0128

Full material

₦ 5,000 $(29)
Pages49
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp

Project Details

DepartmentChemical Engineering
TypeProject
Pages49
Chapters4
MethodologyScientific Method
Reference StyleYES
FormatMS Word & PDF
Reference No.CNG0128

Abstract

CONSTRUCTION OF STEEL
– SHELF
ABSTRACTThe steel-shelf was constructed at the mechanical Engineering workshop of the Institute.  The first step taken in the fabrication of the shelf was the selection of the material suitable for the construction; mild steel was chosen.The construction has the following steps: drawing and dimensioning of the proposed steel – shelf, market surveying and procurement of the needed materials, marketing out and cutting of the material, welding, filling, and finally painting to prevent corrosion.  The dimension of the steel – shelf are: 1219.2mm height, 9…

This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material

Full material

₦ 5,000 $(29)
Pages49
DeliveryInstant, after payment
Order & Download Now Ask a question on WhatsApp
WhatsApp Us