Full material
₦ 5,000 $(29)
| Pages | 49 |
| Delivery | Instant, after payment |
Project Details
| Department | Chemical Engineering |
| Type | Project |
| Pages | 49 |
| Chapters | 4 |
| Methodology | Scientific Method |
| Reference Style | YES |
| Format | MS Word & PDF |
| Reference No. | CNG0128 |
Abstract
CONSTRUCTION OF STEEL
– SHELF
ABSTRACTThe steel-shelf was constructed at the mechanical Engineering workshop of the Institute. The first step taken in the fabrication of the shelf was the selection of the material suitable for the construction; mild steel was chosen.The construction has the following steps: drawing and dimensioning of the proposed steel – shelf, market surveying and procurement of the needed materials, marketing out and cutting of the material, welding, filling, and finally painting to prevent corrosion. The dimension of the steel – shelf are: 1219.2mm height, 9…
This is a preview.Unlock the full abstract, all chapters and references.
Unlock Full Material
Full material
₦ 5,000 $(29)
| Pages | 49 |
| Delivery | Instant, after payment |
